Very narrow sites
Side setbacks of a metre or less limit the width available for a treated zone and restrict machinery, so the method leans on collars and a carefully finished edge within the space that exists.

40 suburbs covered
Barrier work across 40 Eastern Suburbs, from Bondi and Coogee rebuilds to Randwick and Maroubra duplex sites and apartment slabs along the light rail corridor.
Quick answer
New homes in the Eastern Suburbs need a termite management system. The NCC requires one in termite-prone areas, installed to AS 3660.1, with collars and under-slab protection completed before the pour. Randwick, Waverley or Woollahra certifiers ask for the installation certificate and durable notice before the Occupation Certificate.
Barriers across the Eastern Suburbs
The Eastern Suburbs covers 40 suburbs on this site, from Bondi, Bronte and Coogee along the coast through Randwick, Kensington and Maroubra to the harbourside streets of Double Bay, Vaucluse and Rose Bay. There is almost no greenfield land left, so every job is a rebuild, a dual occupancy, a rear secondary dwelling or an apartment slab. Blocks are tight, neighbours are close, and access is usually the first thing a builder wants to talk about.
Ground conditions vary sharply across a few kilometres. Sandy coastal soils sit behind the beaches, filled former swamp lies under parts of Kensington and Eastlakes, and sandstone runs through the harbourside streets. What they share is a century or more of gardens, buried timber and old drainage beneath any new pad. The slab itself is tested where every slab is, at its penetrations, its edge and its joints, and sealing those is only possible while the site is open before concrete.
Get my fixed quote
Local conditions
Three conditions shape barrier work across the Eastern Suburbs.
Side setbacks of a metre or less limit the width available for a treated zone and restrict machinery, so the method leans on collars and a carefully finished edge within the space that exists.
Coastal sand and filled former swamp behave differently under a slab edge than clay, and filled land can hold buried organic material that supports colonies before construction begins.
Rebuild blocks here have been planted since the Federation era. Stumps, sleepers and old drainage sit under the new pad, which raises the value of the under-slab component.
What we install here
Eastern Suburbs work covers replacement houses, dual occupancies, rear dwellings and apartment or boutique unit slabs. We collar every penetration, install the under-slab component or treated zone the design requires, and complete the perimeter and cavity protection as the structure rises, detailing carefully where a new slab meets a retained wall or neighbouring building. Access is agreed with the builder before we attend, and every stage is priced up front.
Councils & certifiers
Three councils certify across this district: Randwick, Waverley and Woollahra, with the City of Sydney taking in the northern fringe. Whichever applies, the certifier needs a certificate recording products, protected areas and the installing technician, plus a durable notice fixed permanently in the meter box with the installation date and inspection advice, both in place before the Occupation Certificate is issued.
Our eastern run covers the beach suburbs from Bondi through Tamarama, Bronte, Clovelly and Coogee, the Randwick and Kensington belt near the university and racecourse, the harbourside streets of Double Bay, Point Piper, Vaucluse and Watsons Bay, and the southern pocket at Maroubra, Malabar and Matraville. Sites near golf courses and large irrigated parkland get extra attention at the perimeter.
Eastern Suburbs
Every suburb has its own page with the local ground conditions, the councils that certify there and the questions builders ask us most.
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Eastern Suburbs questions
Can't see your question? Call and talk it through with a licensed technician.
+61 450 515 215Yes, though the method adapts. With little side clearance there is limited width for a treated zone and restricted machine access, so the system relies on collaring every penetration, the under-slab component and a carefully detailed edge. We review boundary clearances with your builder before quoting so nothing is assumed on the day.
Where the building contains primary elements that termites can damage, the requirement applies regardless of how many dwellings sit above. The work concentrates at slab level: every hydraulic and service penetration collared in one coordinated pass before the pour, with the perimeter completed as the structure goes up.
Loose coastal soils move more than clay and behave differently at a slab edge, so edge finishing and keeping the inspection strip visible matter. Both physical and chemical systems can comply; where a treated zone is used and paving is planned over it, a reticulation line makes recharging practical later.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
