Filled former swamp ground
Much of Kensington was levelled swamp. Filled ground holds moisture and can contain buried organic material, so the under-slab component and a properly treated edge both matter on these sites.

Eastern Suburbs · AS 3660.1
Barrier work through Kensington 2033, on reclaimed swamp ground near UNSW where Federation houses are replaced and apartment slabs rise along Anzac Parade.
Quick answer
Building new at Kensington means installing a termite management system. The NCC requires it in termite-prone areas and AS 3660.1 sets the method, with collars and under-slab work completed before the pour. Randwick certifiers ask for the installation certificate and the durable notice before the Occupation Certificate is issued.
Termite barriers in Kensington
Kensington runs along Anzac Parade about 4.6 km south of the city, in the City of Randwick. Flats and apartments make up most of its housing, but streets of Federation houses and California bungalows survive between them, and those older blocks are where knockdown rebuilds and dual occupancies happen. Larger work follows the Anzac Parade spine, where light rail arrived in 2020 and residential development has followed. The University of New South Wales occupies the old Kensington Racecourse site, with NIDA and The Australian Golf Club nearby.
The ground under much of the suburb was swamp before it was levelled last century. Filled, low-lying land holds moisture and often contains buried organic material, and that combination suits subterranean colonies far better than clean sandstone. On a building site their route in is always the same: a service penetrating the slab, an unprotected edge, or a joint in the concrete. Those routes close properly only while the site is open, which is why the barrier is designed from the slab plan and staged around your pour.
Reviewed by Ismail, founder · Eastern Suburbs coverage · Updated September 2026 · More Eastern Suburbs suburbs
Get my fixed quote
Local conditions
Three conditions shape a Kensington barrier.
Much of Kensington was levelled swamp. Filled ground holds moisture and can contain buried organic material, so the under-slab component and a properly treated edge both matter on these sites.
Replacing a bungalow between existing buildings leaves little room for machinery or for a wide treated zone. The perimeter has to be detailed for the space that actually exists, not the space on a standard drawing.
Residential development along Anzac Parade puts dozens of hydraulic services through one slab. Collar counts and coordination with the hydraulic trade run these jobs.
What we install here
Kensington work covers replacement houses on the older streets, dual occupancies, secondary dwellings and apartment slabs along the Anzac Parade corridor. We collar every penetration, install the under-slab membrane or treated zone the design calls for, and complete perimeter and cavity protection as walls go up. On tight sites we plan access with the builder before attending. The quote is fixed from your plans with each stage set out, and visits are timed so the pour date holds.
Local knowledge
Residential jobs cluster in the streets near Wills Reserve, a couple of hundred metres from the centre, with larger slabs closer to the Anzac Parade light rail corridor. The Australian Golf Club and Gunyama Park sit about a kilometre away, and irrigated open ground like that keeps soil moisture high along neighbouring boundaries, which is worth knowing when a new slab edge is being detailed on an adjacent block.
The City of Randwick certifies building work in Kensington. Your certifier cannot issue the Occupation Certificate without evidence of the termite management system, and that evidence takes two forms: a certificate stating the products installed, the areas protected and the licensed installer, plus a permanent notice in the meter box recording the same detail with the recommended inspection interval. Both are handed over at completion with product information.
Kensington at a glance
| Suburb | Kensington, NSW 2033 |
|---|---|
| District | Eastern Suburbs |
| Distance from Sydney CBD | 4.6 km south |
| Certifying council | Anzac Parade Council |
| Standard applied | AS 3660.1 termite management systems |
| Installed | Before the slab pour, then staged through the build |
| Documents supplied | Installation certificate and durable notice |
| Typical builds covered | New homes, knockdown rebuilds, granny flats, duplexes, townhouses |
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Kensington questions
Still unsure? Call and talk it through with a licensed technician.
+61 450 515 215It raises the importance of what goes under and around the slab. Filled, moisture-holding ground can carry buried organic material from earlier decades, which supports colonies close to where you are building. On those sites we lean on a complete under-slab component plus a fully treated edge rather than relying on the perimeter alone.
Yes, though the detailing changes. Narrow sites limit the width available for a treated zone and restrict machine access, so the design leans more heavily on collars, the under-slab component and a carefully finished edge. We look at boundary clearances with your builder before quoting so the method suits the block.
Yes. Podium slabs carry a large number of hydraulic penetrations, so the work is coordinated with the hydraulic contractor's set-out and completed in one pass ahead of the pour inspection. Documentation is prepared so the certifier can match the installed system to the development approval for the whole building.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
Same crew, same staging and the same certifier-ready paperwork, right across the Eastern Suburbs.
Service areas
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.