33 suburbs covered

Termite Barriers Lower North Shore

Barrier work across 33 Lower North Shore suburbs, from Mosman and Cremorne rebuilds to Chatswood and North Sydney apartment slabs and steep harbourside blocks.

  • Benched and retained sites detailed from the engineering drawings
  • Piers and suspended floors protected on falling harbourside blocks
  • North Sydney, Willoughby, Mosman, Lane Cove and Hunter's Hill paperwork
Suburbs covered33
CouncilsNorth Sydney Council, Lane Cove Council
QuotesFixed, from your plans
BookingAround your slab date

Quick answer

New buildings on the Lower North Shore with termite-susceptible elements need a management system under the NCC, installed to AS 3660.1. Collars and under-slab work precede the pour. Your council's certifier, whether North Sydney, Willoughby, Mosman, Lane Cove or Hunter's Hill, needs the certificate and durable notice before the Occupation Certificate.

Barriers across the Lower North Shore

Steep harbourside blocks and apartment slabs

The Lower North Shore covers 33 suburbs on this site, from North Sydney, Cremorne and Mosman around to Lane Cove, Chatswood, Hunters Hill and Woolwich. Building here is dominated by two things: substantial replacement homes on established, heavily planted blocks, and apartment or townhouse slabs concentrated around Chatswood, St Leonards and the larger centres. Heritage controls apply across a good number of streets.

Terrain is the constant. Land falls towards the harbour and its bays, so pads are benched with retaining walls and step-downs, and suspended floors or pier construction are common where the drop is steep. Mature canopy keeps soil shaded and damp along the building line, and reserves and bushland gullies run down to the water in most suburbs. On any slab the entry points stay the same, penetrations, edge and joints, all of which have to be closed before concrete arrives.

Get my fixed quote
Perimeter barrier in place as framing begins
Perimeter barrier going in as framing starts, on one of our own Lower North Shore jobs.

Local conditions

What lower north shore blocks demand

Three conditions drive barrier detailing on the Lower North Shore.

Benched, retained pads

Blocks fall towards the water, so building platforms are cut and retained. Every batter, retaining wall and step-down is a junction the barrier must follow without leaving a gap.

Dense canopy and damp soil

Mature trees keep ground shaded and moist around the building line, and damp soil beside a warm slab is exactly the condition foraging colonies favour.

Difficult access

Narrow streets, steep driveways and constrained sites limit what can reach a pad, so the method and the staging are agreed with the builder well before the pour.

What we install here

Building across the Lower North Shore

Work here covers replacement homes on established blocks, substantial additions, secondary dwellings and apartment or townhouse slabs near the centres. We collar every penetration, install the specified under-slab component, and complete perimeter and cavity protection as the structure rises, including piers and suspended floor framing where the design steps down the fall. Access is planned in advance, and every stage is itemised in a fixed written quote.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Councils & certifiers

Getting signed off in the Lower North Shore

Five councils certify across this district: North Sydney, Willoughby, Mosman, Lane Cove and Hunter's Hill. Heritage conditions are common and govern appearance rather than the termite requirement. Whichever authority holds your approval, they need the installation certificate covering products, protected areas and installer, plus the durable notice fixed in the meter box, before the Occupation Certificate is granted.

Our run covers the harbourside streets of Mosman, Cremorne, Neutral Bay and Kirribilli, the Lane Cove and Chatswood belt with its reserves and golf courses, the peninsula suburbs at Hunters Hill and Woolwich, and the ridge suburbs around Willoughby, Naremburn and Artarmon. Blocks bordering reserve country or falling to the water get the fullest perimeter treatment and the closest attention at retaining junctions.

Know your pour date?Send the slab plan and we will stage the barrier around your builder.

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Lower North Shore questions

Answered

Can't see your question? Call and talk it through with a licensed technician.

+61 450 515 215
Our block is steep and retained. Can a barrier still be installed?

Yes, and the detailing is where the work sits. Benched pads leave retaining walls, batters and step-downs, each a point where a barrier can be compromised. Send the engineering drawings with the slab plan so those junctions are priced and drawn rather than improvised once the formwork is standing.

Do heritage controls stop a compliant system?

No. Heritage conditions govern what can be altered and how the building looks, while the system sits under and around the slab. The method may change to suit retained fabric and limited access, but the installation still follows AS 3660.1 and the same documentation goes to your certifier.

Which council handles my approval on the Lower North Shore?

It depends on the suburb: North Sydney, Willoughby, Mosman, Lane Cove and Hunter's Hill all certify parts of this district, and boundaries run through some suburbs such as Lane Cove North. We confirm the right authority when quoting so the completion documents match your approval.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site