Perimeter barrier in place as framing begins

Lower North Shore · AS 3660.1

Pre-Construction Termite Barriers Neutral Bay

Under-slab membrane, collars and a perimeter system fitted to AS 3660.1 for Neutral Bay apartment and podium slabs, from Neutral Bay Junction down to the wharf on Hayes Street.

Postcode2089
DistrictLower North Shore
From the CBD4.0 km north
CouncilNorth Sydney Council

Quick answer

Yes, new building work in Neutral Bay, postcode 2089, needs a termite management system. North Sydney Council sits in a termite-prone area, so the National Construction Code applies to apartment podiums and house renovations alike, built to AS 3660.1. Collars and under-slab work happen before the concrete is poured, and we prepare an installation certificate and durable notice for the certifier ahead of the Occupation Certificate.

Termite barriers in Neutral Bay

Why Neutral Bay builds need the barrier in before the pour

Neutral Bay is about 4 km north of the CBD in postcode 2089, within the North Sydney Council area, and is overwhelmingly a suburb of flats and apartments, with a smaller share of semi-detached homes and houses. Military Road forms Neutral Bay Junction, a shopping district of restaurants, cafes and the Big Bear shopping centre, and at the southern end of Hayes Street, Neutral Bay wharf takes public and private ferries across the harbour. Nearly all our work here is an apartment or mixed-use podium slab, with the occasional renovation on one of the suburb's remaining houses.

A suburb built mostly out of flats changes what a termite barrier has to cover. A podium slab can carry dozens of plumbing and service penetrations feeding shared bin rooms, laundries and garages, so every one of them needs its own collar planned from the drawings rather than fitted on the day. The harbour keeps the ground under basements and lower floors damper than it would be further inland, which suits subterranean termites as much as it suits any other pest that likes a humid, sheltered space, so drainage and ventilation around the perimeter get the same attention as the collars themselves.

Reviewed by Ismail, founder · Lower North Shore coverage · Updated September 2026 · More Lower North Shore suburbs

Get my fixed quote
Perimeter barrier run against a sandstone wall
Perimeter barrier run against a sandstone wall — one of our own Lower North Shore installations.

Local conditions

What makes Neutral Bay blocks a termite risk

Three things about Neutral Bay, tied to its density and the harbour, drive how a barrier is detailed here.

Dense podium slabs

Apartment and mixed-use developments here typically pour one large slab carrying dozens of plumbing and service penetrations for shared bin rooms, laundries and garages. Each one is planned from the drawings and collared individually before the pour.

Harbour-side humidity

Proximity to the harbour keeps basements and lower-level ground damper than an inland North Sydney site, and that moisture is exactly what subterranean termites look for. We build extra drainage and ventilation checks into the perimeter design.

Shared services in older blocks

Older walk-up buildings around the suburb share laundries, bin enclosures and plumbing risers between units, and those shared spaces are often where pest activity is first noticed. We inspect the existing building before pricing any renovation work.

What we install here

Building in Neutral Bay

Most of our Neutral Bay work is an apartment or mixed-use podium slab near Military Road or the wharf, with renovations and extensions on the suburb's remaining detached and semi-detached houses. We size collars from the plumbing and service drawings on multi-dwelling jobs and match the membrane and perimeter to the slab design. One fixed quote from the plans covers the whole job, and we time our visit to sit inside your builder's own construction schedule.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Neutral Bay

Hayes Street Beach and the wharf sit at the bottom of the suburb, where harbour humidity is felt most in lower-level storage areas and basements nearby. Cammeray Golf Course, with its irrigated turf, adds moisture to the ground along that boundary. Around Military Road and Neutral Bay Junction, where the suburb's shops and restaurants cluster, our work is almost entirely apartment and mixed-use podium construction rather than standalone house rebuilds.

North Sydney Council certifies building work across Neutral Bay, and before it will release an Occupation Certificate it needs confirmation the termite system meets AS 3660.1. Once installation is finished we assemble an installation certificate that names the products and protected areas, and fit a durable notice inside the meter box, timed so both documents are ready for a strata or building certifier to lodge.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Neutral Bay at a glance

Termite barrier facts for Neutral Bay

SuburbNeutral Bay, NSW 2089
DistrictLower North Shore
Distance from Sydney CBD4.0 km north
Certifying councilNorth Sydney Council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Neutral Bay questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Do apartment renovations in Neutral Bay need a termite barrier?

Yes. Any new building work on termite-prone land needs a compliant system under the National Construction Code, and Neutral Bay's apartment renovations and podium slabs are no exception regardless of how many storeys are involved. We work from the plumbing and service drawings to plan the collar layout before the pour rather than after.

Does harbour humidity in Neutral Bay change how the barrier is installed?

It affects drainage and ventilation detailing more than the products used. Basement and lower-level ground near the harbour tends to hold moisture longer, so we pay particular attention to that alongside the standard collars, membrane and perimeter installed to AS 3660.1 on every job we quote in the suburb.

Our building has an older walk-up laundry and bin room, is that relevant?

Yes. Shared laundries and bin enclosures in older walk-up blocks are commonly where termite and other pest activity is noticed first, since they hold moisture and are disturbed less often than living areas. We inspect those spaces closely before recommending a system for any renovation or extension work on the building.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Neutral Bay

Same crew, same staging and the same certifier-ready paperwork, right across the Lower North Shore.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site