Pre-Construction Termite Barriers Crows Nest

AS 3660.1 termite barriers for the apartment and mixed-use development rising around the new Crows Nest metro station, postcode 2065, in the North Sydney Council area.

Postcode2065
DistrictLower North Shore
From the CBD4.8 km north
CouncilNorth Sydney Council

Quick answer

North Sydney Council's Crows Nest is termite-prone territory under the National Construction Code, so new apartment and mixed-use buildings there need a termite management system, with the AS 3660.1 work finished before the pour. Getting the Occupation Certificate signed off depends on handing the certifier a durable notice for the meter box along with a completed installation certificate.

Termite barriers in Crows Nest

Why Crows Nest builds need the barrier in before the pour

Crows Nest is a busy commercial suburb about 4.8 km north of the CBD, administered by North Sydney Council and centred on a five-way junction of main roads known for its restaurants and shops. The Crows Nest metro station, which opened in August 2024, has brought new apartment and mixed-use development around it, adding to a suburb where St Thomas Rest Park, a former church cemetery on West Street, remains one of the few larger green spaces. Building work here is now dominated by multi-dwelling development near the station rather than single detached houses, which changes the scale and staging of barrier work compared with a typical suburban block.

A slab going in near the new metro station is usually a much larger job than a single house, with dozens of plumbing and service penetrations across one shared building rather than a handful for a single dwelling. Crows Nest's commercial density, with restaurant kitchens and older shopfronts packed close together, also means barrier work often has to account for structures that abut existing buildings rather than sit on a clear block. Getting collars and any under-slab system placed correctly before the pour matters even more on a site like this, because access to the slab edge is far harder once the building is up and occupied.

Reviewed by Ismail, founder · Lower North Shore coverage · Updated September 2026 · More Lower North Shore suburbs

Get my fixed quote
Perimeter termite barrier on a completed slab edge
Perimeter termite barrier on a completed slab edge — one of our own Lower North Shore installations.

Local conditions

What makes Crows Nest blocks a termite risk

Three things shape barrier work on a Crows Nest development site.

New development around the metro station

The Crows Nest metro station, opened in August 2024, has brought a wave of apartment and mixed-use construction to the area around the five-way junction. These are typically large shared slabs with many penetrations, so collar counts and scheduling drive the barrier plan and the price.

Dense commercial and mixed-use streets

Restaurants, shops and older shopfronts sit close together through the suburb, and new buildings often go up hard against existing structures. That makes perimeter access tighter than on a standalone block, so the barrier has to be planned around what is physically achievable on site.

Limited green space, mostly built environment

With St Thomas Rest Park one of the only larger green spaces in Crows Nest, termite pressure here is less about bushland edges and more about the density and age of the surrounding built environment. We assess each site on its own construction and neighbouring buildings rather than a bushland-style approach.

What we install here

Building in Crows Nest

Most of our Crows Nest work is on apartment and mixed-use developments around the new metro station, along with occasional rebuilds of older buildings closer to the five-way junction. These are typically large slabs with dozens of penetrations across multiple dwellings, so collar counts and access to tight, built-up sites drive both the schedule and the price. We stage our visit around the plumber and concreter so the barrier installation keeps pace with a tightly programmed multi-storey build.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Crows Nest

The Crows Nest metro station, opened in August 2024, sits at the centre of the development activity we now see most often in the suburb. St Leonards station, about 1.1 km away, and Cammeray Golf Course, about 1.1 km away, mark the edges of the wider area, while Greenwood Plaza, about 1.6 km off, is another nearby commercial centre. St Thomas Rest Park, the former church cemetery on West Street, remains one of the few green spaces within Crows Nest itself and has little direct bearing on barrier planning compared with the built environment around it.

North Sydney Council certifies development in Crows Nest. Its certifier will not release the Occupation Certificate without proof of the termite system: a durable notice inside the meter box, plus an installation certificate covering products, protected zones and the installer. On the larger apartment and mixed-use projects now common near the metro station, that certificate must name every dwelling on the shared slab, so we compile it from the approved plans and hand it over with product details and maintenance advice.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Crows Nest at a glance

Termite barrier facts for Crows Nest

SuburbCrows Nest, NSW 2065
DistrictLower North Shore
Distance from Sydney CBD4.8 km north
Certifying councilNorth Sydney Council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Crows Nest questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Does a new apartment building near Crows Nest metro station need a bigger termite barrier job than a house elsewhere?

In scale, yes. A shared slab under a multi-storey building can have dozens of plumbing and service penetrations across many dwellings, so collar counts and scheduling around other trades drive both the barrier plan and the price. The underlying AS 3660.1 requirement is the same, just applied at a larger scale.

Does Crows Nest's commercial density change how a barrier is installed?

It can, since new buildings often go up hard against existing shopfronts or apartments, leaving tighter access to the slab edge than a standalone block would have. We assess what is physically achievable on site and plan the perimeter around those constraints before work starts, rather than assuming a standard suburban layout applies.

When should barrier work be booked for a Crows Nest development?

As early as possible once you have a slab date, since collars and any under-slab system need to go in after services are set out and before the pour, and larger developments need more coordination with other trades. Getting us involved during the planning stage helps avoid access problems once the site is under construction.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Crows Nest

Same crew, same staging and the same certifier-ready paperwork, right across the Lower North Shore.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site