Barrier membrane and mesh installed before the pour

Northern Beaches · AS 3660.1

Pre-Construction Termite Barriers Bilgola Plateau

Perimeter and under-slab barriers fitted before the pour on Bilgola Plateau builds, on high ground where homes back onto Angophora Reserve and bush running down to Pittwater.

Postcode2107
DistrictNorthern Beaches
From the CBD26.9 km north
CouncilNorthern Beaches Council

Quick answer

Yes, a new home or rebuild on Bilgola Plateau needs a compliant termite management system under the NCC, because the area is termite-prone within Northern Beaches Council. Collars and under-slab work are done before the pour, following AS 3660.1, and we hand your certifier the paperwork, notice and certificate included, before the Occupation Certificate is signed off.

Termite barriers in Bilgola Plateau

Why Bilgola Plateau builds need the barrier in before the pour

Bilgola Plateau sits about 150 metres up on the Barrenjoey Peninsula, on high ground once known as Mount Loftus, with homes looking east over the ocean and west across Pittwater. It is mainly residential, with two small rows of shops, a park and a primary school on top of the plateau, and building work here is almost entirely new houses and rebuilds on established blocks rather than new subdivisions. Northern Beaches Council signs off on these builds, and a termite management system installed to standard is a requirement before the Occupation Certificate is issued.

Angophora trees and bush reserves border parts of the plateau, and homes on its edges often back onto steep, vegetated land that keeps the ground shaded and damp year-round. Being high and exposed also means these homes cop strong winds that can loosen roof tiles and let water into roof spaces, adding moisture from above as well as from the bush below. A barrier here needs to account for both, closing off the ground-level entry points a foraging colony would use before the slab is ever poured, and checking roof access while the scaffold is still up.

Reviewed by Ismail, founder · Northern Beaches coverage · Updated September 2026 · More Northern Beaches suburbs

Get my fixed quote
Pre-construction barrier on a waterfront build
Pre-construction barrier on a waterfront build — one of our own Northern Beaches installations.

Local conditions

What makes Bilgola Plateau blocks a termite risk

Three conditions on the plateau change how we approach the barrier.

Bush edges along the plateau

Angophora Reserve and similar bushland border parts of the suburb, and homes on those edges sit close to established termite activity, so the perimeter on that side needs full coverage rather than a minimal strip.

Exposed high ground, wind-driven moisture

Strong winds on exposed plateau blocks can loosen roof tiles and let water into roof voids, adding damp timber above the slab as well as around it, so we flag roof access as part of the overall termite risk picture, not just the barrier.

Moisture from both coastlines

With ocean air to the east and Pittwater to the west, timber and sub-floors on the plateau stay damper for longer than on an inland block, conditions that favour a foraging colony and make sound edge detailing more important.

What we install here

Building in Bilgola Plateau

Bilgola Plateau work is mostly new houses and knockdown rebuilds on established blocks close to the bush edge, with some suspended floor and pier construction where the land falls away. Collars seal every penetration ahead of the pour, the perimeter goes in as the build progresses, and roof access and sub-floor detailing are checked in the same visit. We price every stage once from your plans, scheduled around your builder.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Bilgola Plateau

Homes near Angophora Reserve sit closest to established bush, so those builds get the fullest perimeter treatment we offer. Blocks nearer Bilgola Plateau Park are more open but still close enough to garden beds and trees that ants, spiders and termites move between them and neighbouring yards. Down towards Clareville Beach on the Pittwater side, moist air off the water is the bigger factor in how we detail sub-floor and deck areas.

Northern Beaches Council is also the certifying authority for Bilgola Plateau builds. Before they will sign off the Occupation Certificate, they want a notice describing the system, secured inside the meter box, and an installation certificate setting out the products, protected areas and licensed installer. We hand over both documents at handover, together with product information and ongoing maintenance advice.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Bilgola Plateau at a glance

Termite barrier facts for Bilgola Plateau

SuburbBilgola Plateau, NSW 2107
DistrictNorthern Beaches
Distance from Sydney CBD26.9 km north
Certifying councilNorthern Beaches Council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Bilgola Plateau questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Do homes backing onto Angophora Reserve need extra termite protection?

Yes, blocks on that bush-facing edge sit closest to established colonies, so we generally recommend a full physical perimeter rather than a minimal one, with particular attention to any step-downs or retaining walls where the slab meets the sloping ground. We price that extra detailing from your plans before the pour date, so there are no surprises once work starts.

Does wind damage on the plateau add to termite risk?

Indirectly, yes. Strong winds here can loosen roof tiles and let water into roof spaces, and that dampness gives termites and other timber pests another way in from above. We check roof access as part of a plateau job, alongside the ground-level barrier, so the two risks are looked at together rather than treated as separate jobs.

Can you install a barrier on a Bilgola Plateau block with a suspended floor?

Yes, sloping plateau blocks often call for a suspended floor, and we design collars, bearer protection and a perimeter barrier around that framing rather than assuming a standard slab. Paperwork for your certifier is unaffected by the construction type, and covers whichever system actually goes in on the day.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Bilgola Plateau

Same crew, same staging and the same certifier-ready paperwork, right across the Northern Beaches.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site