Penetration collars fixed through the mesh before concreting

Canterbury-Bankstown · AS 3660.1

Pre-Construction Termite Barriers Narwee

Under-slab membrane, collars and a perimeter system installed for Narwee knockdown rebuilds and extensions on 1950s timber-pier blocks, beside the Broad Arrow Road shops and Narwee station.

Postcode2209
DistrictCanterbury-Bankstown
From the CBD15.5 km south-west
CouncilGeorges River Council

Quick answer

A rebuild or new home in Narwee needs a termite management system, because the suburb is a termite-prone part of both the Canterbury-Bankstown and Georges River council areas. The National Construction Code requires a system built to AS 3660.1, fitted while the slab is still open. Once installation is complete, we put together the installation certificate and durable notice for whichever council is certifying your build.

Termite barriers in Narwee

Why Narwee builds need the barrier in before the pour

Narwee is shared between the City of Canterbury-Bankstown and Georges River Council, about 15.5 km south-west of the Sydney CBD in postcode 2209, with most of its growth coming in the 1950s and suburban family homes still dominating its tree-lined streets. The main shopping strip runs along Broad Arrow Road beside Narwee station on the Airport and South line, with the Narwee Hotel nearby, and the former Narwee High School site, closed in 2001, has been redeveloped for housing. A steady run of knockdown rebuilds on the older 1950s blocks makes up most of our work in the suburb.

Houses from that decade were commonly built with timber floors on brick piers and tiled roofs, and it is that sub-floor and roof void combination that termites and rats find easiest once they get past the outer wall. Demolishing one of these houses does not clear the activity that timber-pier construction has supported for seventy years, so the soil around a new footprint needs the same attention as the slab edge itself. The shopping strip and rail corridor along Broad Arrow Road add older commercial buildings nearby too, which is worth knowing if your rebuild sits close to that stretch.

Reviewed by Ismail, founder · Canterbury-Bankstown coverage · Updated September 2026 · More Canterbury-Bankstown suburbs

Get my fixed quote
Pipe penetrations sealed into the termite barrier membrane
Pipe penetrations sealed into the termite barrier membrane — one of our own Canterbury-Bankstown installations.

Local conditions

What makes Narwee blocks a termite risk

Three local conditions shape how a termite barrier is planned for a Narwee rebuild.

Timber floors on brick piers

1950s Narwee homes typically sit on timber floors over brick piers, a sub-floor arrangement termites find easily once they are past the outer edge. We inspect what remains of that structure before pricing a rebuild's system.

Mature street trees

Narwee's tree-lined streets hold more fallen timber and shaded, damper soil than a newly cleared estate, which gives termites an easier approach to a rebuild site. We check plantings close to the new footprint as part of every quote.

Commercial buildings on Broad Arrow Road

Older shops and the pub beside Narwee station have had decades for timber to be found by termites, and a rebuild close to that strip inherits some of that same pressure. We factor the site's proximity to the shops into the plan.

What we install here

Building in Narwee

Most of our Narwee work is a knockdown rebuild, extension or granny flat on an established 1950s block, plus the occasional infill site near the old high school land. We fit under-slab membrane, collars and a perimeter suited to timber-pier construction, checking any retained roof void as closely as the new slab. Pricing is one fixed figure from the plans, and we schedule the visit around your builder's own program rather than a date of our own choosing.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Narwee

Narwee station and the Broad Arrow Road shops sit close to much of the suburb, and the rail corridor together with the commercial strip is a common feature of site conditions nearby. Windarra Reserve holds grass and trees that shelter pests close to several homes. Further out, Canterbury Public Golf Course and Riverwood Plaza mark the edge of the wider district, where irrigated turf and retail activity add their own conditions rather than affecting Narwee blocks directly.

Certification in Narwee depends on which side of the suburb a block sits, either the City of Canterbury-Bankstown or Georges River Council, though both ask for identical paperwork before the Occupation Certificate is released. We confirm the correct authority early, then supply an installation certificate naming the products and protected areas alongside a durable notice fitted permanently inside the meter box.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Narwee at a glance

Termite barrier facts for Narwee

SuburbNarwee, NSW 2209
DistrictCanterbury-Bankstown
Distance from Sydney CBD15.5 km south-west
Certifying councilGeorges River Council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Narwee questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Does it matter which council certifies our Narwee build?

Not for the termite system itself. Whether your block falls under the City of Canterbury-Bankstown or Georges River Council, both require the same installation certificate and durable notice before the Occupation Certificate can be issued. We check which authority applies to your address early so the paperwork is addressed correctly from the start.

Our Narwee home has timber floors on brick piers, does that matter for a rebuild?

Yes. That construction is exactly the kind of sub-floor space termites find easily, so we inspect what is left of it once demolition is done, then size the collars, under-slab work and perimeter to AS 3660.1 based on what the site shows us rather than a standard assumption.

When should the barrier go in for a Narwee rebuild?

Once your plumber has set out the new drainage and before the concreter arrives, the same window as any other new slab in the area. Tell us your expected pour date as early as possible so we can lock in a visit that fits your builder's schedule without holding up the rest of the job.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Narwee

Same crew, same staging and the same certifier-ready paperwork, right across the Canterbury-Bankstown.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site