Perimeter barrier run against a sandstone wall

Sutherland Shire · AS 3660.1

Pre-Construction Termite Barriers Bonnet Bay

Perimeter and under-slab barriers detailed for steep sandstone blocks around Burnum Burnum Reserve, fitted before the pour on Bonnet Bay rebuilds and home extensions alike.

Postcode2226
DistrictSutherland Shire
From the CBD21.4 km south-west
CouncilAcross Sutherland Shire

Quick answer

Yes, a new home or rebuild in Bonnet Bay needs a termite management system under the NCC, since Sutherland Shire's area is termite-prone. Collars and any under-slab work are finished before the pour, to AS 3660.1, and the durable notice plus installation certificate are given to your certifier once that stage of the build is done.

Termite barriers in Bonnet Bay

Why Bonnet Bay builds need the barrier in before the pour

Bonnet Bay sits on the eastern bank of the Woronora River, developed from the late 1960s through to the mid-1980s, so almost every home is a brick family house of that era with only two roads leading in and out of the suburb. With the estate long since completed, building work here is knockdown rebuilds and extensions on those established blocks rather than new subdivisions. Sutherland Shire is the certifying authority, and a compliant termite management system is needed for any new slab or extension footing before the Occupation Certificate is issued.

What sets Bonnet Bay apart is the terrain. This is Sydney sandstone country, with steep gullies, creeks and escarpments, and Burnum Burnum Reserve surrounds the suburb and joins other bushland reserves nearby. That puts houses here closer to termites, and moisture draining off the slopes can linger under a home built partway down a gully. A rebuild on a stepped or sloping block needs the barrier detailed around every retaining wall and change in level, because that is exactly where water pools against lower footings and where termites most often start working.

Reviewed by Ismail, founder · Sutherland Shire coverage · Updated September 2026 · More Sutherland Shire suburbs

Get my fixed quote
Penetration collars fixed through the mesh before concreting
Penetration collars fixed through the mesh before concreting — one of our own Sutherland Shire installations.

Local conditions

What makes Bonnet Bay blocks a termite risk

Three conditions tied to Bonnet Bay's sandstone terrain shape how we detail the barrier.

Sandstone gullies and escarpments

Steep gullies and creeks running through Bonnet Bay keep bushland close to almost every street, and established termite colonies in that terrain forage into gardens on the bush-facing side of a block, so the perimeter there needs full coverage.

Water pooling against stepped footings

Where a house steps down a gully, water draining off the slope can pool against the lower walls, and those damp footings are where termite activity most often starts, so we detail retaining wall junctions with particular care.

Established brick homes on old blocks

Most Bonnet Bay homes date from the late 1960s to mid-1980s, and a rebuild on one of these blocks is usually replacing a house that carried decades of garden growth and buried timber, which we check for before quoting the soil treatment.

What we install here

Building in Bonnet Bay

Bonnet Bay work is mostly knockdown rebuilds and extensions on sloping, sandstone-edged blocks, with piers and suspended floors common where a house steps down towards a gully. Every plumbing penetration and conduit gets sealed with a collar before the pour, the perimeter is detailed carefully around retaining walls, and sub-floor access on sloping sites is planned from the outset. One quote from your plans covers every stage, timed to your builder's program.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Bonnet Bay

Blocks nearest Bilba Reserve sit right against bushland and leaf litter that shelter termites and other pests close to the house, so the perimeter on that boundary is given full coverage. Further from the bush edge, closer to Jannali station, sites are slightly more open, but the same stepped terrain applies across most of the suburb, so retaining wall detailing matters almost everywhere in Bonnet Bay.

Sutherland Shire Council certifies Bonnet Bay builds. Ahead of the Occupation Certificate, the certifier wants a notice recording the system installed, secured inside the meter box, and an installation certificate noting the products used, areas protected and licensed installer. We hand over both, plus product data sheets and maintenance advice, timed around whatever other Shire approvals your build still needs.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Bonnet Bay at a glance

Termite barrier facts for Bonnet Bay

SuburbBonnet Bay, NSW 2226
DistrictSutherland Shire
Distance from Sydney CBD21.4 km south-west
Certifying councilAcross Sutherland Shire
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Bonnet Bay questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Does a Bonnet Bay block need extra protection because of the sandstone terrain?

Blocks close to Burnum Burnum Reserve or any bush-facing gully sit nearest established termite activity, so we usually recommend a full physical perimeter with careful detailing around retaining walls and step-downs, rather than a minimal system suited to a flat suburban block on level, cleared ground far from any reserve.

How do retaining walls on a Bonnet Bay block affect the barrier?

Every retaining wall or level change where the slab steps down the slope is a junction that needs to be drawn and priced before we start, since water pooling against a lower footing is where termite activity most often begins. We detail these junctions the same way we detail the open slab edge.

Can you install a barrier on a suspended floor stepping down a Bonnet Bay gully?

Yes, a stepped Bonnet Bay block often calls for piers and a suspended floor rather than a slab, and we build the collars, bearer protection and perimeter around that framing instead. Your certifier still receives the durable notice and installation certificate, written up to match whichever construction method the block actually needed.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Bonnet Bay

Same crew, same staging and the same certifier-ready paperwork, right across the Sutherland Shire.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site