Narrow terrace blocks
Boundary-to-boundary sites leave little room for a wide treated zone and restrict access, so the system leans on collars and a carefully detailed edge within the space that exists.

Inner West · AS 3660.1
Pre-construction barriers through Leichhardt 2040, where terraces, houses and apartments each make up about a third of homes around the Norton Street strip.
Quick answer
A new dwelling or new slab at Leichhardt needs a termite management system under the NCC, installed to AS 3660.1. Collars and under-slab protection are fitted before the pour and the perimeter is completed as the build proceeds. Inner West Council certifiers need the certificate and durable notice before the Occupation Certificate.
Termite barriers in Leichhardt
Leichhardt sits about 5 km west of the city and is the administrative centre of Inner West Council. Its housing divides almost evenly into three: terraces and townhouses, separate houses, and apartments. Norton Street north of Parramatta Road is the commercial spine, with the Italian Forum, MarketPlace Leichhardt and a long run of cafes, while Leichhardt Oval, the light rail stops and Hawthorne Canal on the western side round out the local picture. Building work is mostly rear additions, full rebuilds behind retained facades and small townhouse developments.
Inner west sites bring their own constraints. Terrace blocks are narrow and boundary-to-boundary, old drainage runs beneath them, and gardens have been in place for a century, leaving buried timber and organic material in the soil. Hawthorne Canal and the surrounding open space hold moisture nearby. When a new slab goes down, the colony tests the same three weaknesses, the penetrations, the edge and the joints, which is why the barrier is designed from the plans and installed before the concrete arrives.
Reviewed by Ismail, founder · Inner West coverage · Updated September 2026 · More Inner West suburbs
Get my fixed quote
Local conditions
Three Leichhardt conditions shape the work.
Boundary-to-boundary sites leave little room for a wide treated zone and restrict access, so the system leans on collars and a carefully detailed edge within the space that exists.
Long-established gardens and old drainage lines leave buried timber and damp ground beneath new slabs, which can support a colony before construction starts.
New slabs attached to a retained house create a junction between old and new work. That interface is detailed deliberately rather than left to chance.
What we install here
Leichhardt work covers rear additions, full rebuilds behind retained frontages, secondary dwellings and small townhouse slabs. We collar every penetration, install the under-slab membrane or treated zone the design requires, and complete the perimeter and cavity protection as the structure goes up, paying particular attention where new slabs meet retained walls. Access on terrace sites is planned with the builder. The quote is fixed from your plans, stage by stage.
Local knowledge
Jobs run through the streets either side of Norton Street, close to Norton Plaza a few hundred metres from the centre, and out towards Hawthorne Canal on the western side. Sites near the canal and the surrounding open space sit on damper ground, so the treated edge and the inspection strip get particular attention there, while inner blocks are mostly about access and the junction with retained structures.
Inner West Council certifies construction at Leichhardt, and conservation area controls apply across many streets. Those controls affect appearance rather than the termite requirement, which stands: before the Occupation Certificate, the certifier looks for a certificate covering products, protected areas and installer details, plus a durable notice permanently fixed in the meter box with the installation date and inspection advice.
Leichhardt at a glance
| Suburb | Leichhardt, NSW 2040 |
|---|---|
| District | Inner West |
| Distance from Sydney CBD | 5.1 km west |
| Certifying council | Inner West Council |
| Standard applied | AS 3660.1 termite management systems |
| Installed | Before the slab pour, then staged through the build |
| Documents supplied | Installation certificate and durable notice |
| Typical builds covered | New homes, knockdown rebuilds, granny flats, duplexes, townhouses |
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Leichhardt questions
Still unsure? Call and talk it through with a licensed technician.
+61 450 515 215If the addition includes a new slab or new primary building elements that termites can damage, then yes, and the certifier will expect documentation covering that work. We quote for the new portion and pay close attention to the junction between the new slab and the retained structure, since that interface is a common weak point.
Yes, with the method suited to the site. Boundary-to-boundary blocks limit the width available for a treated zone and restrict machine access, so the design relies on collaring every penetration and finishing the edge carefully. We check clearances with your builder before quoting so the approach is settled in advance.
Conservation controls govern what the building looks like from the street rather than what sits under the slab, so a compliant system is still installed to AS 3660.1. What can change is access and how much disturbance is acceptable around retained fabric, and we work that through with your builder before the pour.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
Same crew, same staging and the same certifier-ready paperwork, right across the Inner West.
Service areas
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
