Pipe penetrations sealed into the termite barrier membrane

St George & Bayside · AS 3660.1

Pre-Construction Termite Barriers Sans Souci

With Lady Robinsons Beach on one side and Kogarah Bay on the other, Sans Souci in postcode 2219 has damp ground on two fronts, and a knockdown rebuild here needs its barrier detailed for both.

Postcode2219
DistrictSt George & Bayside
From the CBD14.8 km south-west
CouncilBayside Council

Quick answer

Yes, a new home or knockdown rebuild in Sans Souci needs a termite management system under the NCC, since it sits between two bays in a termite-prone part of Sydney. The system is installed to AS 3660.1 before the concrete pour, with collars fitted at every penetration. A durable notice for the meter box and an installation certificate for the certifier are both required before the Occupation Certificate.

Termite barriers in Sans Souci

Why Sans Souci builds need the barrier in before the pour

Sans Souci sits about 14.8 km south-west of the CBD in postcode 2219, split across Bayside Council and Georges River Council. Water sits on two sides here: Lady Robinsons Beach and Cook Park on Botany Bay to the east, and Kogarah Bay to the west, with the Captain Cook Bridge crossing the Georges River north to Sans Souci. A shopping strip on Rocky Point Road near Sandringham Street carries most of the local retail, and boating clubs including the St George Sailing Club, St George Motor Boat Club and Botany Bay Yacht Club reflect how much of local life revolves around the water on both sides.

Homes near Kogarah Bay or Cook Park get close checks of sub-floor moisture and perimeter entry points from us, because the suburb's position between two bodies of water keeps soil damper than a typical inland block. That moisture is exactly the condition subterranean termites forage through, and Sans Souci's largely residential character means a barrier has to be planned around whichever bay a block sits closest to, since the two sides of the suburb do not carry identical ground conditions even though they're only a short walk apart, and outdoor structures near the water get the same close attention as the main house.

Reviewed by Ismail, founder · St George & Bayside coverage · Updated September 2026 · More St George & Bayside suburbs

Get my fixed quote
Perimeter termite barrier on a completed slab edge
Perimeter termite barrier on a completed slab edge — one of our own St George & Bayside installations.

Local conditions

What makes Sans Souci blocks a termite risk

Three local factors shape how a Sans Souci barrier gets detailed.

Botany Bay to the east

Lady Robinsons Beach and Cook Park sit on the Botany Bay side of Sans Souci, and homes near that edge get close checks of sub-floor moisture, because damp ground like this is exactly what subterranean termites forage through looking for timber.

Kogarah Bay to the west

The suburb's western edge runs down to Kogarah Bay, and blocks on that side face the same kind of moisture pressure as the Botany Bay side, just from a different body of water. We check both edges of the suburb the same way.

A boating and marina community

Boat sheds, marinas and storage around the St George clubs mean outbuildings on many Sans Souci blocks sit right at the water's edge. Where an outbuilding needs its own termite protection, we plan that as part of the overall barrier.

What we install here

Building in Sans Souci

Sans Souci work is mostly knockdown rebuilds and renovations of homes near either bay, plus retirement village and boat shed sites along the water. Waffle pod and raft slabs suit most residential rebuilds, and we fit collars to every pipe and conduit penetration, running the perimeter to the true boundary. Homes near Kogarah Bay or Cook Park get particular attention to sub-floor moisture and perimeter entry points, and we schedule our visit around your builder's program throughout.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Sans Souci

Noel Seiffert Reserve sits close to much of our Sans Souci work, its grass and trees a reminder of the ground cover close to both bays. Beverley Park Golf Club, the nearest large irrigated area, adds moisture to blocks on that side of the suburb as well. Between Lady Robinsons Beach and Cook Park to the east and Kogarah Bay to the west, water shapes almost every barrier we detail here, and we treat the two sides of Sans Souci as genuinely different ground rather than one uniform suburb.

Sans Souci is split across Bayside Council and Georges River Council, and neither will issue an Occupation Certificate without a meter-box notice recording the system used and an installation certificate covering the products, the treated areas and the licensed installer's details. We get both documents ready as soon as our stage of a Sans Souci rebuild is finished, whichever of the two councils ends up certifying your address.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Sans Souci at a glance

Termite barrier facts for Sans Souci

SuburbSans Souci, NSW 2219
DistrictSt George & Bayside
Distance from Sydney CBD14.8 km south-west
Certifying councilBayside Council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Sans Souci questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Do homes near Kogarah Bay need extra termite protection?

Yes. Homes near Kogarah Bay or Cook Park get close checks of sub-floor moisture and perimeter entry points from us, because the damp ground on that side of Sans Souci is exactly the condition subterranean termites forage through. We install a full, continuous perimeter on blocks close to either bay.

Which council certifies termite barrier work in Sans Souci?

Sans Souci falls across both Bayside Council and Georges River Council, and both expect identical evidence before an Occupation Certificate: a meter-box notice and an installation certificate naming the products, the areas treated and the licensed installer. We get both ready regardless of which side of the suburb your address sits on.

Do boat sheds and marina buildings need their own termite protection?

Often, yes. Outbuildings, boat sheds and storage near the water sit in the same damp conditions as the main house, so where one needs its own termite management system we detail it as part of the overall barrier plan, with the same collars, perimeter and certification as the rest of the build.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Sans Souci

Same crew, same staging and the same certifier-ready paperwork, right across the St George & Bayside.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site