High penetration counts
Apartment and podium slabs carry dozens of hydraulic and service penetrations. Collaring is the bulk of the work and has to be coordinated with the hydraulic trade in one pass before the pour.

Inner South & City Fringe · AS 3660.1
Barrier work in Zetland 2017, the Green Square town centre suburb where medium and high density slabs rise on former racecourse, factory and naval store land.
Quick answer
New buildings at Zetland containing termite-susceptible elements need a management system under the NCC, installed to AS 3660.1. Collars are fitted to every slab penetration before the pour and the perimeter follows. City of Sydney certifiers require the installation certificate and durable notice before the Occupation Certificate.
Termite barriers in Zetland
Zetland sits about 4.4 km south of the city in the City of Sydney, its name taken from Zetland Lodge, a stable established in 1874. The land later held Victoria Park racecourse, a vehicle assembly factory between 1950 and 1975, and a Naval Stores depot until the mid-1990s. Today it forms part of the Green Square Town Centre, with medium and high density apartments, Green Square Plaza, retail along Ebsworth Street and the Gunyama Park aquatic centre, so construction here is overwhelmingly multi-dwelling.
Industrial history and dense development set the conditions. Ground that has carried a racecourse, a factory and a naval depot is made ground in places, with fill and buried material below the surface, and the low-lying southern city fringe holds moisture. On an apartment slab, the risk concentrates in the sheer number of hydraulic and service penetrations, each one a route unless it is collared before the concrete goes down. Edge protection and joint detailing complete the picture on these podium slabs.
Reviewed by Ismail, founder · Inner South & City Fringe coverage · Updated September 2026 · More Inner South & City Fringe suburbs
Get my fixed quote
Local conditions
Three Zetland conditions drive barrier planning.
Apartment and podium slabs carry dozens of hydraulic and service penetrations. Collaring is the bulk of the work and has to be coordinated with the hydraulic trade in one pass before the pour.
Former racecourse, factory and depot land often means fill and buried material beneath new slabs, which changes what the under-slab component has to deal with.
Ground here sits low and holds moisture, and damp soil against a slab edge keeps foraging pressure up even in a dense urban setting.
What we install here
Zetland work is dominated by apartment and podium slabs, with occasional townhouse and mixed-use developments. We work from the hydraulic set-out, collar every penetration in a single coordinated pass, install the under-slab component specified for the design and complete the perimeter as the structure rises. Documentation is prepared so it can be matched to the development approval for the whole building. Everything is priced as one fixed quote with stages listed against the construction program.
Local knowledge
Sites sit within a short walk of Nuffield Park, about a hundred metres from the centre, with Green Square station less than a kilometre away and The Australian Golf Club a little beyond it. The dense Green Square precinct means most work is multi-dwelling, so the program is set by the main contractor and the hydraulic trade rather than by the weather or the size of a single footprint.
The City of Sydney certifies development at Zetland, and Green Square projects are usually large enough to involve a private certifier working to that approval. Either way, the evidence required before the Occupation Certificate is the same: a certificate identifying products, protected areas and the licensed installer, plus a durable notice fixed permanently in the building's meter box or services area with the inspection recommendation.
Zetland at a glance
| Suburb | Zetland, NSW 2017 |
|---|---|
| District | Inner South & City Fringe |
| Distance from Sydney CBD | 4.4 km south |
| Certifying council | Sydney CBD Council |
| Standard applied | AS 3660.1 termite management systems |
| Installed | Before the slab pour, then staged through the build |
| Documents supplied | Installation certificate and durable notice |
| Typical builds covered | New homes, knockdown rebuilds, granny flats, duplexes, townhouses |
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Zetland questions
Still unsure? Call and talk it through with a licensed technician.
+61 450 515 215Where a building includes primary elements that termites can damage, the NCC requirement applies regardless of how many storeys sit above. In practice the work concentrates at slab level, collaring every hydraulic and service penetration and protecting the edge, which is exactly where concealed entry would otherwise occur.
It affects what is under the slab. Made ground and fill from earlier uses can contain buried material and behave differently to natural soil, so the under-slab component and the way the edge is finished are chosen with that in mind rather than assuming clean, undisturbed ground.
By working to the hydraulic contractor's set-out and completing the collar stage in one pass ahead of the pour inspection, with the perimeter finished as the structure rises. Dates are locked with the main contractor in advance, and the documentation is issued so the certifier can match it to the approval for the whole development.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
Same crew, same staging and the same certifier-ready paperwork, right across the Inner South & City Fringe.
Service areas
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
