National park boundary
Royal National Park runs along the southern edge, and remnant forest survives within the suburb. Blocks facing that country get a continuous perimeter and careful detailing where the slab steps down the fall.

Sutherland Shire · AS 3660.1
Barrier work across Kirrawee 2232, split between industrial slabs north of the railway and bush-outlook home sites running south towards Royal National Park.
Quick answer
Yes, a new dwelling at Kirrawee needs a termite management system. The NCC requires one and AS 3660.1 governs the install: collars and under-slab work before the pour, perimeter during construction. Sutherland Shire certifiers must receive the installation certificate and durable notice before the Occupation Certificate.
Termite barriers in Kirrawee
Kirrawee lies between Sutherland and Gymea, about 22 km south-west of the city in the Sutherland Shire, and it divides at the railway. North of the line sits a mixed commercial and industrial area of small to medium factories, dealerships and service businesses. South of it the suburb is residential, with many homes looking out to bushland and Royal National Park forming the southern border. The former brick pit has become South Village, which opened in 2018 with a shopping centre and several hundred apartments, so both house and apartment construction happen here.
The bush boundary is what makes the southern half distinctive. Remnant Sydney Turpentine Ironbark Forest survives in the suburb, a critically endangered ecosystem, and national park country runs along the southern edge, both holding mature timber and litter that sustain established colonies. From there it is a short forage through soil to a new slab, where the weaknesses are always the same, service penetrations, the edge and the joints. They close before the pour or they stay open, which is why the barrier follows the slab plan.
Reviewed by Ismail, founder · Sutherland Shire coverage · Updated September 2026 · More Sutherland Shire suburbs
Get my fixed quote
Local conditions
Three Kirrawee conditions shape how a barrier is built.
Royal National Park runs along the southern edge, and remnant forest survives within the suburb. Blocks facing that country get a continuous perimeter and careful detailing where the slab steps down the fall.
Factory and dealership slabs north of the line and houses to the south need different planning. Industrial work turns on service counts and sequencing, housing on edge detail and staging.
Redevelopment on the old brick pit put hundreds of dwellings on large slabs. High penetration counts mean the hydraulic set-out drives the program on those sites.
What we install here
Our Kirrawee work covers replacement houses and secondary dwellings in the southern streets, plus larger residential and commercial slabs closer to the station. Every service is collared, the specified under-slab component goes in, and perimeter and cavity protection follows the walls. Suspended floors and piers are treated where blocks fall towards bushland. Each job is quoted as one fixed price with stages itemised, booked so a barrier visit never sits between the plumber and the pour.
Local knowledge
Jobs cluster within a few hundred metres of Kirrawee station and Pollard Park, spread south through the residential streets towards the park boundary, and out towards the Sutherland Leisure Centre about a kilometre and a half away. Homes with a bush outlook get the fullest perimeter treatment, while sites nearer South Village and the industrial pocket are driven by penetration counts and coordination between trades.
Sutherland Shire Council certifies construction at Kirrawee. Before the Occupation Certificate is issued, the certifier looks for proof that a compliant system is installed, which means a certificate listing products, protected areas and the installing technician, and a permanent meter box notice recording the system, its date and the recommended inspection interval. Both are provided with product data and maintenance advice for the owner.
Kirrawee at a glance
| Suburb | Kirrawee, NSW 2232 |
|---|---|
| District | Sutherland Shire |
| Distance from Sydney CBD | 22.5 km south-west |
| Certifying council | Across Sutherland Shire |
| Standard applied | AS 3660.1 termite management systems |
| Installed | Before the slab pour, then staged through the build |
| Documents supplied | Installation certificate and durable notice |
| Typical builds covered | New homes, knockdown rebuilds, granny flats, duplexes, townhouses |
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Kirrawee questions
Still unsure? Call and talk it through with a licensed technician.
+61 450 515 215It raises the priority of the perimeter. National park country and remnant forest hold mature timber that supports established colonies, and they forage outward through soil, so a park-adjacent slab gets a continuous treated or shielded edge and detailed junctions at every step-down rather than a partial treatment on the exposed faces.
Yes. Larger residential slabs carry dozens of hydraulic penetrations, so the collar stage is coordinated with the hydraulic contractor and completed in one pass before the pour inspection. Documentation is prepared so the certifier can match the installed system to the approval covering the whole development.
Sloping sites are benched, leaving retaining walls, batters and step-downs where a barrier can be left with a gap. We ask for the engineering details alongside the slab plan so those junctions are drawn and priced before work starts, and we protect any piers or suspended floor framing that the design includes.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
Same crew, same staging and the same certifier-ready paperwork, right across the Sutherland Shire.
Service areas
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
