Collars and perimeter barriers going in before the pour on Concord rebuilds around Queen Elizabeth Park, Majors Bay Reserve and the garden blocks off Majors Bay Road.
Rebuilding in Concord, yes, the termite management system is not optional, Canada Bay council checks for it before the Occupation Certificate goes out. This is termite-prone ground, so the job is built to AS 3660.1: collars fitted, soil or membrane work done, all wrapped up before the slab is poured. We put together the meter box notice and the installer's paperwork once that stage is finished.
Termite barriers in Concord
Why Concord builds need the barrier in before the pour
Concord is a residential suburb about 9.5 km west of the Sydney CBD, in postcode 2137 and the City of Canada Bay. It is often called the Parkland Suburb, with Queen Elizabeth Park, Majors Bay Reserve, Concord Oval and many smaller reserves scattered through it, and it borders several bays and inlets of the Parramatta River. The Majors Bay Road shopping village has cafes, restaurants and a supermarket, and Parramatta Road runs along the southern edge. Housing is mostly detached family homes on garden blocks, with some units, and new construction is largely knockdown rebuilds and extensions on those established blocks, since Concord is fully built out. Whatever the scale of the project, council checks for a compliant termite system before agreeing to close the file.
In Concord, gardens, trees and parks are the biggest influence on termite risk. Established gardens and large trees support activity close to many blocks, and moist soil near the bays and reserves suits subterranean termites working underground toward a new slab or extension footing. Many homes have been extended over the years, and each addition can create a hidden gap or a damp corner where a barrier was never properly closed off. Because so much of the suburb sits near a reserve or a stretch of the Parramatta River foreshore, we treat the surrounding garden as part of the assessment, not just the building footprint, before recommending a system for a Concord rebuild.
Reviewed by Ismail, founder · Inner West coverage · Updated September 2026 · More Inner West suburbs
Barrier membrane and mesh installed before the pour — one of our own Inner West installations.
Local conditions
What makes Concord blocks a termite risk
Three things about Concord's parks and waterways shape termite risk on a rebuild here.
Parks and reserves throughout the suburb
Queen Elizabeth Park, Majors Bay Reserve and the many smaller reserves scattered through Concord all add mulch, garden beds and mature trees that can shelter termite activity close to nearby blocks. Properties backing directly onto one of these reserves usually need a fuller perimeter.
Moist soil near the bays
Blocks close to the Parramatta River's bays and inlets hold moisture in the ground for longer than blocks further inland, and a colony working through wet soil rarely announces itself before it reaches a slab. We pay particular attention to slab edges on these blocks.
Additions that hide old gaps
Many Concord houses have been extended more than once over the decades, and each addition creates a join in the structure where a barrier can be interrupted if it was not properly detailed at the time. A rebuild or new extension needs the whole building checked, not just the new section.
What we install here
Building in Concord
Almost everything we do in Concord is a knockdown rebuild or an extension on an established garden block near one of the suburb's parks or reserves, since so little vacant land remains. Waffle pod and raft slabs are standard here. Collar timing follows the plumber's rough-in, and on an addition we start by working out how the original house was protected, then tie the new barrier into it wherever the old detailing allows. Every job is costed as one fixed written quote covering the whole scope of work.
Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
ReticulationA pipe network laid before paving so the treated zone can be topped up later.
Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.
Local knowledge
Around Concord
Edwards Park and Massey Park Golf Course sit close to much of our Concord work, where mulch, garden beds and irrigated turf keep the surrounding ground damp for longer after rain. Cabarita Shopping Centre and the wider Majors Bay Road strip add food waste that draws other pests, while Concord Oval and Queen Elizabeth Park, toward the centre of the suburb, are where many of the largest established gardens and mature trees sit close to residential blocks.
Canada Bay is the certifying council for Concord, and the Occupation Certificate does not get released until two things exist: a meter box notice naming the system, and a written record from us covering what products went in and where. For an extension we make a point of describing how the new work connects to whatever protection the original house already had, so a certifier sees one coherent property rather than two separate jobs.
4 neighbouring suburbs covered by the same crew
Slab date locked in?Tell us the pour date and we will book the stages around your builder.
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
Our technician installing a perimeter barrier on a live Sydney site.
For builders & developers
Built around your program, not ours
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
What we need to quote
Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details
Fitting in with your trades
Collars in before the pour inspection
Slab edge & cavity as walls go up
Perimeter done before paving
Multi-unit & repeat work
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
No certification delays
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
Everything you get at handover
A complete document set for the builder, the certifier and every future owner of the property.
Durable notice
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Installation certificate
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Product information
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
Care & inspection advice
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Recent termite barrier installations
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
A barrier only works while it stays intact and visible. Pass these on to the owner.
Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
No garden beds or stacked timber against the house
Keep weep holes clear of render and debris
Fix leaking taps, downpipes and hot water units near the walls
Ask the installer before drilling through the slab or adding pipes
Book a timber pest inspection at least every 12 months
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspectionHanded over recently? We inspect the barrier and the building every 12 months.
Do Concord's parks increase termite risk on a rebuild?
Reserves like Queen Elizabeth Park and Majors Bay Reserve, along with the many smaller parks scattered through Concord, hold established garden beds and mature trees that can shelter termite colonies close to nearby blocks. Properties backing directly onto one of these reserves typically get a fuller perimeter than a block set well back from any park, since the pressure is more direct.
Does an old extension affect a new Concord termite barrier?
It can. Older extensions sometimes have a gap or a poorly detailed join where the original barrier, if there was one, was never properly continued. When we work on a further addition or a rebuild, we check how the existing structure was protected and tie the new system into it, so the whole property ends up covered under one certificate.
Why does moisture near the Parramatta River matter for a barrier?
Ground close to Concord's bays and inlets tends to stay damp for longer than blocks further from the water, and that moisture is exactly the condition subterranean termites use to move toward a structure without being noticed. We usually pay closer attention to slab-edge detailing on these blocks, since a gap is more likely to be found and used in consistently damp ground.
Does a new home need a termite barrier in NSW?
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
What does a pre-construction barrier cost?
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
We also install barriers around Concord
Same crew, same staging and the same certifier-ready paperwork, right across the Inner West.
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.